null

Dynomite Diesel Ford 99-03 7.3L Individual Stock #8 LONG LEAD Injector DDP.AENEW

(No reviews yet) Write a Review
$342.00
SKU:
DYDDDP.AENEW
UPC:
671875112039
Availability:
Usually Ships in One or Two Days

Product Overview

Ford 99-03 7.3L Powerstroke Injector: Brand New (not reman) long lead injector intended for cylinder #8 on some 99-03 7.3L engines. Stock power level injector. Sold individually with all the latest revisions.

Note: This particular injector is solely intended for the #8 cylinder on some engines which came equipped with what's known as a long lead injector installed in that cylinder. If you are unsure what your engine came equipped with or do not want to take the time to check then order DDP ADNEW for the #8 cylinder and the other seven cylinders if needed.

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
  • Not For Sale In California

Fitment:

  • 2003 - 2003 Ford F-350 Super Duty King Ranch
  • Warranty:1 YearWarning:CALIFORNIA WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov

    Reviews

    (No reviews yet) Write a Review